Penyelesaian Sumur dan Kerja Ulang
Kode Mata Kuliah
TM4103
Jumlah SKS
2
Semester
Jenis Mata Kuliah
C
Bahan Kajian
Bahan Kajian | Kedalaman |
---|---|
HCH Darley and G.R. Gray., Composition and Properties of Drilling and Completion Fluids, Gulf Publishing, 1988 | Expert |
J. Bellarby, Elsevier, Well Completion Design, Volume 56 (Developments in Petroleum Science), 2009 | Expert |
W.C. Lyons, Working Guide to Drilling Equipment and Operations, Gulf Professional Publishing, 2010 | Expert |
W. K. Woods, and J. D. Ott, Modern Sandface Completion Practices Handbook, 2003 | Expert |
W. Renpu, Advanced Well Completion Engineering, Gulf Professional Publishing, 2011 | Expert |
Capaian Pembelajaran Lulusan (CPL) yang diemban mata kuliah
Kode CPMK | Unsur Capaian Pembelajaran Mata Kuliah (CPMK) |
---|---|
CPMK 1 | Mampu mengidentifikasi berbagai sumber data sumur dan bawah permukaan serta ketidakpastian terkait |
CPMK 2 | Mampu menerapkan solusi analitis atau numerik yang tepat untuk mengevaluasi permasalahan sumur dan bawah permukaan |
CPMK 3 | Mampu mengintegrasikan aspek sumuran, bawah permukaan dan permukaan dalam optimalisasi perolehan fluida dan injeksi fluida bawah permukaan |
CPMK 4 | Mampu mengidentifikasi komponen teknis sumur |
Metode Pembelajaran
- Diskusi Kelompok Pembelajaran Berbasis Masalah Studi Kasus
Modalitas Pembelajaran
- Luring Asinkron Mandiri Kelompok
Metode Penilaian
- Kuis Tugas Ujian Tengah Semester Ujian Akhir Semester